This solar PV installation was the first project to be completed by KCEL and has been generating power since the 9th May 2013.

 

The detailed inverter monitoring for this early project originally used a system that was specific to the inverters deployed and it was not until 13th June 2016 that our now standardised Solar-Log monitoring was installed.

 

There is a sizeable, south(ish)  facing, roof area available, with 200 panels installed producing 44kWp. It generates approximately 38,755kWh of energy and saves more than 20 metric tons of carbon dioxide on an annual basis.